Essential
3.6 kWp- 8 panels
- 3,100 kWh / year
- £540–£730 annual benefit
AORO SOLAR CONFIGURATOR
Use your postcode, electricity demand and property details to see an indicative solar and battery starting point before speaking with an AORO specialist.
CONFIGURE YOUR SYSTEM
The result changes with the project route, location, consumption, roof conditions and battery requirement. No personal details are requested until you choose to speak with AORO.
STEP 01 · PROJECT ROUTE
Choose the route that best reflects the property or programme. This changes the system limits and the next-step recommendation.
STEP 02 · LOCATION AND PROPERTY
The postcode identifies the locality and map area. Add the property address so AORO can review the correct roof if you request an assessment.
STEP 03 · ENERGY AND ROOF
Your annual electricity use is the strongest starting point. If it is unavailable, choose the nearest household or project profile.
STEP 04 · INDICATIVE RESULT
Compare a lean starting point, the balanced recommendation and a future-ready option. Installed pricing is confirmed only after the project scope and site conditions are reviewed.
WHAT THE MODEL CONSIDERS
The calculator organises the information that matters before an AORO specialist reviews the site. It does not replace survey, design or grid assessment.
Regional solar assumptions are linked to the postcode area and then refined during design.
Annual consumption and daytime use influence system capacity and battery value.
Orientation and shading adjust the indicative generation model before survey.
EV, heat-pump and resilience plans prevent a short-term recommendation.
ENGINEERING ASSESSMENT
Send the calculator summary to AORO. A specialist will review the information, identify what is still required and explain the correct next step.
CALCULATOR QUESTIONS
Understand what the model can indicate and what must still be confirmed by engineering.
The calculator provides an indicative starting point based on the information entered and regional generation assumptions. A final system design, installed price and performance forecast require an AORO technical assessment.
You can compare the indicative result with or without battery storage. The appropriate usable capacity depends on consumption timing, solar generation, backup requirements and future electricity demand.
The postcode identifies the broad project location so the calculator can display the area and apply a regional solar-generation assumption. It does not replace a roof survey or confirm installation availability.
Yes. Select the relevant project route for an indicative starting point. Larger, complex and multi-site projects are transferred to AORO for portfolio-level assessment and engineering.
No. The result is not a quotation, offer or performance guarantee. AORO confirms system design, scope, pricing, grid requirements and predicted generation after reviewing the project information.
ENGINEERED. ACCOUNTABLE. CONNECTED.